MS Burrow Scraper Conveyer in the Thai Cement Project

Background

A local cement producer in Thailand expands its clinker production line. Its old transfer machines run over eight years. The plant lacks reliable sealed conveying gear for powder and clinker transit. The firm decides to replace core conveyors to streamline raw material delivery.

Troubles

Open-style old belt conveyors generate heavy dust and waste lots of raw materials from spillage. Aging parts trigger frequent sudden breakdowns and halt continuous kiln operation. Slow feeding limits kiln load, and daily output stays below designed standard all year round, which keeps production cost at a high level.

Solution

We deliver MS double-chain en-masse scraper conveyor. The unit arrives at Thailand site on May 31 and finishes field installation. MS’s robust double chain bears heavy load, fully sealed trough cuts dust leak, wear-resistant flights handle abrasive clinker and slag. It connects upstream and downstream production sections directly.

Final Outcome

Dust and material spillage get fully fixed after equipment startup. The transfer line works consistently with far fewer unexpected stops and less daily maintenance time. Feeding efficiency rises by 18%, daily cement output breaks the old production limit. The client completes its capacity expansion and cuts comprehensive production cost successfully.

Table of contents

    Share This Article

    Related Products

    Related Cases

    Leave Message